ALS Beamline 12.0 Scheduling Database

Login
Login to work with the
proposed schedule
Calendar
Start:

End:

ALS Schedule
ALS Web Site
Test Cookies

 

 

 

 

 

 

 

 

 

Name Code Branch
ALS Shutdown S ALS
Kenneth Goldberg K3 12.0.1.3
Patrick Naulleau PN 12.0.1.3
Accelerator Physics AP ALS
Alexei Fedorov AF 12.0.1.1
Name Code Branch
CXRO C1 12.0.1
Dan Dessau DD 12.0.1.1
Kevan Group SK 12.0.2.2
Yanwei Liu YL 12.0.2.1

Proposed Schedule

May
2008
01
Th
02
F
03
S
04
Su
05
M
06
Tu
07
W
08
Th
09
F
10
S
11
Su
12
M
13
Tu
14
W
15
Th
16
F
17
S
18
Su
19
M
20
Tu
21
W
22
Th
23
F
24
S
25
Su
26
M
27
Tu
28
W
29
Th
30
F
31
S
owl . . . .     . .   . .            1              2              
day     . .           .  3                                        4
swing .   . .     .     .    5    6              7              8      

Notes are not shown.

Confirmed Schedule

May
2008
01
Th
02
F
03
S
04
Su
05
M
06
Tu
07
W
08
Th
09
F
10
S
11
Su
12
M
13
Tu
14
W
15
Th
16
F
17
S
18
Su
19
M
20
Tu
21
W
22
Th
23
F
24
S
25
Su
26
M
27
Tu
28
W
29
Th
30
F
31
S
owl . . . .     . .   . .                                        
day     . .           .                                          
swing .   . .     .     .                                          

 

 

 


This site is designed in HTML and PHP (v. 4.3.2) using a MySQL database (v. 3.23.55); it is running on an Apache 2 Web Server on Mac OS X 10.4.
Web design and database programming by K. A. Goldberg, 2003-8.